Hello Experts

U stock materials (Serviceable ) should consider material for MRP and not for availability check in PM orders

We have solved the problem by settings in the customizing in PP that we are able to set the materials at stock U location (serviceable )should not be considered in Mat Availability for PM orders

Settings we have made for all storage locations in U * By excluding storage location stock from MRP

If storage location stock is excluded from MRP at plant level, no receipts for this storage location will be created in the MRP planning run.

so we are able to run the availability check perfectly

But now MM dept.is not accepting this as they want this stock to be considered for MRP

Has anybody done this scenario successfully please reply the solution

In short we want stocks of Materials at U serviceable location should not consider for Work order material Availability check

But at the same time it should consider stocks of Materials at U serviceable location for MRP run what is way to do this

Regards

Pratap

Accepted Solutions (1)

Accepted Solutions (1)

madlercm
Active Contributor
0 Kudos

A way that I think of, is to set the ATP at SL level, so in PM order you check only in a specific location, not in all the plant.

Of course that you need to let all SLs to be relevant for MRP, otherwise this stock is not considered for planning.

Answers (0)