on 02-09-2011 9:26 AM
Dear All,
For the material availabity or withdrwal of material the configuration in MM is working means
how the configuration of stock determiantion item table is working and related to sap PM work orders
In that table special stock indicator,storage location ,priority indicator ,valuation type
how it can be working please tell me what is the sap 's idea for this configuration related to SAP PM
Spro path MM -stock detrmination -define strategies for stock determiantion
Please reply
Regards
Pratap
Pratap,
Material availability check for PM orders are dependent upon the checking rule and checking group assigned. Stock determination config is not related to PM , even though indirectly Stock determination group and stock determination rule correspond to the checking rule and checking group in the availability check.
Thanks
Narasimhan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.