hey guys,
we have a 3 system landscape with the following clients:
DEV 100: golden configuration client
DEV 200: unit test
CIQ 100: qa configuration client
ciq 200: quality/test client
cip 100: production client
I have all the clients locked down to "not modifiable for both customizing and repository objects" except the DEV 100 client. One of my analysts wants to make changes to the master data in the unit test client because the master data is not there in the configuration client. Should I open this unit test client for modifications? If I do so, will I need to import the changes to CIQ and CIP through transport method or would those changes be made manually ? any kind of best practices surround the changes to master data ? My main concern is that if I open the unit test client, everybody would start doing development and customizing in that client and the configuration client would go out of sync. Please advise.
thanks
VM