Is it possible to add a operation to a prod. order which is REL & PCNF?

Former Member
0 Kudos

Is it possible to add a operation to the production order which is released and partially confirmed?

Requirement:

In a typical production process, total 5 operations are utilized. But due to one particular operation (Opr.30 -

filling) did not happen properly, which results in having additional operation (reheating), which needs

to be accomodated.

How to map the above process in SAP

Accepted Solutions (1)

Accepted Solutions (1)

sundaresan_velayudam
Active Contributor
0 Kudos

Add manually the reheating operation In co02 in operation overview,

Former Member
0 Kudos

If this happens often, have this operation as the last operation with optional confirmation and with bare minum time and ask them to confirm based on the actuals.

But if this not desired, as said earlier you can always add operation even when the order is released

cheers

Ravi