CA01 - routing copy to a different material

Former Member
0 Kudos

Hi team

I need your help with tcde CA01

Currently when you make a copy of routings in CA01 transaction for the same material that is, if the material already has a route of production and the operation already has the components when making a copy based on the route of production to an alternate route, a copy of the routing and assignment of the operation to the components is done.

But to make a copy of a route from one material to another material the route is copied identical but the assignment of the operation of the components is not done, I mean that components are not assigned and for this case has to be done manually one by one, spending time in the rework being that operations had already been assigned the correct components ....

Question can we do something to make it automatically do this copy of assignment of operations to the components on the route.

NOTE: As I mention this case only occurs when there are engineering changes or when a replacement assemblies.

Regards & thks in advance

Accepted Solutions (0)

Answers (2)

Answers (2)

0 Kudos

Hello!

Did you know one way?

Today I have the same problem.

I need create with copy a routing, but without all the fields.

Former Member
0 Kudos

Try this

enter CA01

enter material, plant

Select copy from (F5)

Select type "routing"

enter group # to copy from

select BOM alternative, if more than one exists

Maintain status

SAP will copy all operation, BOM, Sequence, MIC

Make changes if needed and save

Former Member
0 Kudos

Hi! thks for your reply,

I have performed the listed step.. but i have not get the expected results.

If i copy material X to material X --> all the operation are copied.

if I copy material X to material Y --> operation not copied.

do you have any other idea?