on 02-08-2011 7:42 AM
Dear all
i m using QA40 for mass UD for 03 lot origin, when i execute this tcode , UD for some of the lots are not made these are shown in qa32 screen how could i do the mass ud of all the lots
would u plz guide ma about qa40
thanks
Hi Nasir,
Is there any waiting time maintained @ the plant level setting? May be due the reason that waiting period is not completed, few lots are not comiing under auto UD.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Lets start again
1.Is all char in the task list are "Optional" char
2.Is char are long Term( if yes then need to tick on long term in selection screen of qa40 )
3.status of chars should be "4" or "5"
4.In QM view "Skip allowed" & "Auto UD" Indicator must be in place.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Try this. In your development system, pick a couple of lots that aren't being found by the mass UD transaction. Then for each of these go in and up date just one characteristic. Just record a value. You can even come in and remove the value. But what this does is it should change the lot status to INSP. Inspection started. See if you can mass process them now. I haven't outright proven it, but I suspect, that for 03 lots, if inspection is set up, you must do at least one characteristic in order to mass UD the lot. Or at least get the lot to an INSP status.
FF
What settings are you using in QA40?
The first three radio buttons are used to determine what orders it selects inspection lots for.
If you selected "orders completed" you might not get all the orders picked up. I find many clients get orders technically complete (TECO status in the order) but not completed status. Have you tried running QA40 with the other options?
FF
Dear FireFighter
i tried with all option ord, but still not get
as i m also dealing with production order s o i know about the status of orders
actually i my recent implementation i used to do all this by using QA16 with lot status REL i always did the mass UD of all lot with this status but here i am finding some difficulty in doing this and i m unable to diagnose
Can you do this? Find one of the inspection lots that is not being picked up. Make sure all the inspection characteristics are locked and closed (status 5) and then post us the list of system statues assigned to the lot and the statuses of the matching production order.
Then do the same for a lot where you expected it to be processed with the optional characteristics and no results recoorded.
We migth be able to tell from those.
FF
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
91 | |
8 | |
7 | |
4 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.