Dear Sir
I have maintained operation scrap in the routing of a material i.e1%.I created a production order for 100.When i confirm the
the order system is showing 100 in yield.But the system should show 99 in Yield & 1 in scrap.
What can be the reason?
With Rgds
Debasish