Hallo Experts,

If I have to replace an old meter with a new meter ,what shoulds be the system status of the new meter?

does it always have to be EFRE or even ELAG works.

I am trying to use the function module ISU_S_WORKLIST_INSTALL for meter replacement . I always get the error back

"The status of the meter does not allow to install the new meter' when i try to use a new meter with status ELAG.

Could some one tell me if the status really maters.

Thanks

1 REPLY 1

former_member201275
Active Contributor
0 Kudos

here we go: