Skip to Content
0
Former Member
Feb 02, 2011 at 01:56 PM

METER REPLACEMENT

93 Views

Hallo Experts,

If I have to replace a meter with a new meter ,what shoulds be the system status of the new meter?

Is is always have to be EFRE or even ELAG works.

I am trying to use the function module ISU_S_WORKLIST_INSTALL for meter replacement . I always get the error back

"The status of the meter does not allow to install the new meter' when i tray to use a new meter with status ELAG.

Could some one tell me if the status really maters.

Thanks