Profit Centre substitution rule not working

We are building a new box/system, and have now got to the PRD box stage. Unfortunately, the substitution rule in PRD does not appear to be working, and when we add a sales order item, it determines profit centre as DUMMY

I have checked the following matches to QAS.....

0KEM - The substitution rule

0KEL - The link to SD

KE52 - The profit centre master data, and that they are active

If I put simulation on, I can see the rule is accessed and that my expected step is true, but it still comes back with dummy.

Are theere any checks I've missed?

Is there anything on the Sub riule side I need to "Activate" in the PRD box?

Any advice appreciated.

Graham

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • Best Answer
    Feb 02, 2011 at 03:23 PM

    Hi,

    At time of sales order the profit center can be set by

    1. CO account assignment (strongest option)

    2. Manual entry

    3. PCA substitution

    4. Material / plant (weakest option)

    So if the sales order has account assignment to say a PA segment which contains PRCTR = dummy then that will get preferance over the value from substitution.

    regards

    Waman

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Waman, I think you've cracked it.

      The PC on the account assignment field is set as Dummy, this is comming from the WBS, where its blank.

      We had set this as mandatory, but were using a diff profile for cut-over projects, and I think it hasn't been set in there.

      I'll fix this and re-test

      Thank again

      Graham

  • Feb 02, 2011 at 01:46 PM

    Hi

    Check 0KEM if the substitution rule is active for your contr area

    BR,Ajay M

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Ajay

      Can you give any more information, like a transaction code or IMG path. I thought I'd looked everywhere, and can't see any obvious activate nodes.

      I've looked through the controlling and enterprise controlling areas.

      The only activation I have found so far, is in 0KEL, which matches our the settings in our QAS system.

      Thanks

      Graham

  • avatar image
    Former Member
    Feb 10, 2011 at 06:56 AM

    Hi,

    Cheak Your Material Master Profit Centre Field

    Check Transaction code -3keh if and okb9