Hi All,

We are planning to start the SPM installation in production system for our client. What are the prerequisites and preliminary checks to be carried for exsisting production system before proceeding with the SPM installtion.

Currently the system has the following configuration,

SAP_ABA 701 0008 SAPKA70108

SAP_BASIS 701 0008 SAPKB70108

PI_BASIS 701 0008 SAPK-70108INPIBASIS

ST-PI 2008_1_700 0003 SAPKITLRD3

SAP_BW 701 0008 SAPKW70108

ANAXSA 210 0005 SAPK-21005INANAXSA

BI_CONT 704 0009 SAPK-70409INBICONT

OPMFND 210 0005 SAPK-21005INOPMFND

ST-A/PI 01M_BCO 700 0001 SAPKITAB7F

Also, please advice on the downtime procedures for SPM installation.

Do we have any data regarding Down time(when, Step, etc) in the SPM installation & configuration guide.

Thanks,

Regards