Dear Gurus
While creation of production order the system is not able to pick up the operations of routing instead it is generating an operation
in the production order itself with the status opgn.In the log for read pp master data in production order it is showing Sel. ID 01, priority 01 for task list type N selected. This is okay as I have maintained in selection id 01 the usage 01 and status 04 the same I have maintained in routing.If I remove the workcenter from the operation of the routing then the system is picking up the routing.I have also checked the workcenter usage it has application p that is of routing. Please advice.
Regards
Sandip Sarkar