Skip to Content
0
Former Member
Jan 26, 2011 at 01:35 AM

Rule not proposing alternate location

18 Views

Initially posted in the (incorrect)APO master data forum.

Hi All,

Was evaluating a rule that says confirm at loc B entirely while order is at loc A. All basic settings.Rule control for location is forward from input and cyclic, product is forward from input, no restrictions on qualified prod and loc, combination sequence is combine qualified loc with products first..then qualified prod with loc, union combination. Rule is correcly evaluated and determined but confirmation is still happening at original location WITH an information icon on the RBA check screen that has the legend (POSSIBLE FURTHER SUBSTITUTIONS ACCORDING TO RULE (UNCHKD)

Check instruction is to evaluate rule immediately .. no remaining requirements created, no product avail check, no allocation check, no checking horizon

Any hints as to what I might be probably missing

Regards,

Loknath