cancel
Showing results for 
Search instead for 
Did you mean: 

Assignment of single component of BOM on two operations

Former Member
0 Kudos

Dear All,

Can anybody guide me how can i assign a single component of BOM on two operations. i.e, suppose component A is used in a BOM and qty is 10 KG. now 7 kg os this component is used in operation 1 and 3 kg in other. so in routing how can i assign. Please dont give me the solution of two line items in BOM as i think it is not proper way. thanks

Accepted Solutions (0)

Answers (1)

Answers (1)

madlercm
Active Contributor
0 Kudos

May not be proper, but may be the only one...