Dear All,
Can anybody guide me how can i assign a single component of BOM on two operations. i.e, suppose component A is used in a BOM and qty is 10 KG. now 7 kg os this component is used in operation 1 and 3 kg in other. so in routing how can i assign. Please dont give me the solution of two line items in BOM as i think it is not proper way. thanks
May not be proper, but may be the only one...