I am installing ABAP application server within Netweaver 7.02 which has been downloaded from this site on my LAPTOP.

Phases 1 -15 took about 2 hrs to install.

After that it entered Phase 16 i.e Import ABAP and it has gone on for more that 12 hrs.

Of the 37 processes in this phase the last 2 doesn't complete. One is shown as running and other is waiting.

My Laptop has around 320GB HDD(100 GB free) 4 GB RAM of which only 3GB is usable as it as 32 bit OS,2.4 GHZ Core 2 Duo

processor and Windows Vista.

I think it is abnormal to continue for so long.

It does not show any error message nor any problem in the log.

What is the problem?

Pls advise.

Thamk for your efforts.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • avatar image
    Former Member
    Jan 24, 2011 at 07:15 AM

    Hi,

    Speed of this phase depends on number of things:

    1) How many number of parallel jobs you have selected in sapinst ?

    2) 4 GB of RAM is not much. So, it will take time.

    Thanks

    Sunny

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      I agree with mahendra ... it is the best way to restart the installation if logs are not getting updated.

      There must be an external factors are reason for this issue, your laptop must be corrupted with virus or it might have hung due

      to temporary memory bottle neck ...