on 01-24-2011 1:49 AM
Dear all,
we are working for an engg inductry, when we do result recording and if it is out of spec some rework is done can we do resul recording for that in same insp lot i.e we want an M.I.C which should not valuate the result
If we want M.I.C wherein we can carryout multiple result recordings for same lot if it fails again we can submit
Please advice the procedure
Thanks in advance
venkat
Following can be done provided that you are not taking UD of the inspection lot containing the MIC's :--
You can use the Inspection points for the Inspection lot Say In the Task list header you enter "Free Defined Inspection points"
Also Enter the sampling procedure against each MIC in the char level.Make sure that you have created the sampling procedure with inspection points.
This setting will allow you to do multiple result recording for the same set of MIC's
But If you are doing usage decision of the lot then you may explore the concept of "Long Term Inspection" in control in dicator of the Char.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You can also handle you scenario using un-planned MIC. Here are the steps
1. Enter results and valuate MIC as usual.
2.If results are out of spec select MIC attribute as "invalid".
3. Enter a new un-planned MIC using Edit --> enter additional char(F5)
4. After re-work, enter results for this new MIC as usual
5. Enter UD after all the MIC's are processed.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
7 | |
7 | |
4 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.