reg valuationof an M.I.C in result recording

Dear all,

we are working for an engg inductry, when we do result recording and if it is out of spec some rework is done can we do resul recording for that in same insp lot i.e we want an M.I.C which should not valuate the result

If we want M.I.C wherein we can carryout multiple result recordings for same lot if it fails again we can submit

Please advice the procedure

Thanks in advance

venkat

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • Best Answer
    avatar image
    Former Member
    Jan 24, 2011 at 09:14 AM

    Following can be done provided that you are not taking UD of the inspection lot containing the MIC's :--

    You can use the Inspection points for the Inspection lot Say In the Task list header you enter "Free Defined Inspection points"

    Also Enter the sampling procedure against each MIC in the char level.Make sure that you have created the sampling procedure with inspection points.

    This setting will allow you to do multiple result recording for the same set of MIC's

    But If you are doing usage decision of the lot then you may explore the concept of "Long Term Inspection" in control in dicator of the Char.

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Jan 26, 2011 at 03:18 AM

    You can also handle you scenario using un-planned MIC. Here are the steps

    1. Enter results and valuate MIC as usual.

    2.If results are out of spec select MIC attribute as "invalid".

    3. Enter a new un-planned MIC using Edit --> enter additional char(F5)

    4. After re-work, enter results for this new MIC as usual

    5. Enter UD after all the MIC's are processed.

    Regards

    Add comment