In MSC1N, I created a batch 2010-11 for the material SG99 in Plant A, strg loc SL1. In Basic data tab, I gave the Date of Manufacture & Available From date as 15.1.2011. Now the issue is that when Iu2019m creating the same batch i.e. 2010-11 for the same material SG99, on 22.1.2011 for Plant B with MSC1N, then the Date of Manufacture & Available From date are coming as 15.1.2011 by default & they are also non editable (grey).
1. Why the date of mfg of Plant A is coming automatically for Plant B?
2. Why it is in non editable mode even in create mode (MSC1N)?
Note: Batch level is set at material level by PP.
Is that date problem coming because of this setting? If so how can I set the batch level at plant level? Iu2019m working on fresh implementation & on setting the batch lvl at plant sys is giving message: u201CThis type of conversion is not yet implemented. Message no. CZ 308u201D. Pls advice.
Thanks in advance.
Edited by: R S on Jan 22, 2011 8:10 AM
Also you should activate Batch at Plant level for which check Note 41715 - Resetting batch level from material to plant level
thanks
G. Lakshmipathi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
In Basic data tab, I gave the Date of Manufacture & Available From date as 15.1.2011.
For information, in material master both Basic Data1& 2 are client level and it is not plant specific.
thanks
G. Lakshmipathi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
11 | |
11 | |
6 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.