Skip to Content
author's profile photo Former Member
Former Member

ODS Load Scenario with Process Chains

Hi, I have 5 ODS objects to load and activate in a process. I know that I can't activate them all at once because each activation takes up about 5 processes. So how would I do this?

I want to load the infopackages.

activate the ods objects, but only one at a time if the load was successful for each ODS....

Any direction is greatly appreciated!

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Jul 09, 2004 at 09:14 AM

    With a Process Chain you should be able to ... because after each activation (Process in generali, eg. load ...) you can decide which action(s) should be carried out on positive or negative end (or however ...).

    So you can link ODS2 loading to succesfull activation of ODS1 and so on ...

    However each ODS loading can be executed even using only one processe, just switching InfoPackages radion button in section "Processing".

    Hope it helps

    GFV

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.