Skip to Content

PNP ignores date selection

Hey, I need to get every absence of a employee. The absence should be selected by a due date. Every Absence existing on that date should be selected.

Right now every absence is selected. The date entered on the selection screen is totally ignored. Thought the PNP (I'm a beginner) would handle that selection on its own. Or do I have to select that on my own?

Thanks for your hints!

Add a comment
10|10000 characters needed characters exceeded

Related questions

0 Answers

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.