Hello,
i post an MM-Movement type (Bewegungsart) 309 (material to material).
The MM-goods movement works, but then in warehouse mangagement there is a problem:
The creation of the transfer order (Transportauftrag) stops in many cases.
The aim is to post Material A to the same storage bin in Warehouse Management where Material B was before.
I programmed this in user-exit (ZXLToU03) that by movement type 309, always taking same storage bin. But then I often get the error: transfer order could not be created. Then I have to do the creation of tranfer order in foreground and then I get an error like this:
capacity of the bin location is not enough.
The Problem is that I do a posting for example:
001 010101 to 922 Umbuchungzone --> Transfer order Pos 1
922 Umbuchungszone to 001 010101 --> Transfer order Pos 2.
And so the first transfer order position is not confirmed when I do the transfer order Pos 2.
How can I confirm Pos 1 by batch-input? The Programm to do 309 should posting 1000 materials in one step. But in Warehouse management I get those problems?
Is it possible to increase the capacitiy of the storage bin and then decrease it after creation of transfer order(where can I do this and when)???
I hope anybody can help me.
Thanks.