Transport from production to development

Hi Gurus,

I have a typical case, we have two BW landscapes, one is Dev and other is Prod

We have developed a Workbook and included 3 queries in the same workbook. When everything worked well, we have moved this workbook and the 3 queries to Production system.

Unfortunately, the BW Dev system undergone a restore operation and we have lost the developed Workbook and other 3 queries.

Now we only had the option either to develop those workbooks and reports again or is it possible to transport these workbooks and queries from production system to development system?

Appreciate your inputs

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Jan 18, 2011 at 11:34 AM

    Hi,

    1. First collecte it in a workbench TR in Production. and release this request.

    2. Now create a TR as "Tranport copies request" in SE10 . This is 3rd type of TR apart from Customizing TR and Workbench TR.

    3. Include the components of TR relesed in first step into the TR created in 2nd step.

    4. Now go to edit mode for TR created in step 2, specify the DEV system Logical name as the destination for this Tr.

    5. Now release this TR. And if you refresh the STMS in DEV you can get it in the list. So import it.

    Regards,

    Anil Kumar Sharma .P

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jan 18, 2011 at 10:32 AM

    Prince,

    Ask your Basis team do a system copy from PRD to DEV rather than doing through transports as its not best pratice

    Thanks

    SB

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Shanthi Bhaskar

      Hi,

      a. Collect the required objects into a transport request in Prod.

      b. Ask the basis to manually transfer the respective TR file from PROD folder to DEV folder

      c. You should then be able to import the request manually into DEV

      Speak to basis.

      ~R

  • Posted on Aug 22, 2016 at 06:45 PM

    Hi, we try Collect and have problem in SE03 Customizing. 1. First collecte it in a workbench TR in Production. and release this request. Mensaje is : Setting the system parameters can not change the object ELEM Steps ? You can indicate the NameSpace necesary turn to Modificable ?

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.