Hello,
I have the following situation:
I Have a PO with stock type (X Quality inspection) for a material (inspection type 01 was activated in material master).
...
then I disable QM procurement in material master.
When I create a GR the material goes to 'Quality Inspection" without inspection lot.
Is it possible when a GR is posted material goes to "Unrestricted Use" also for existing PO?
Thanks in advance
regards
Angel