Hi ,
I have maintained the fixed cost & Variable cost in KP 26 for the activity type .
for 1 hr
Fixed cost : 1
Variable cost :1
Operation duration is 1 hr , when i check the Planned cost it shows total plan cost is 6.92 ,
Fixed cost as 3.46 and variable cost as 3.46 ,
How the system calculates 6.82 ,
I have maintained the valuation Variant for the activity type is Plan price for the period .
As per my understanding system has to calculate the Planned cost as 2 (1 for fixed + 1 for Variable )
Can anybody explain me why the system calculated the price as 6.82 ...
Thanks in Advance ...