Hi,
I am analysing possibility to confirugre in COPA Valuation using Material Cost Estimate. My goal is to have one common operating concern for 4 controlling areas.
I am wondering if it is possible to configure it for one operating concern if 4 company codes (controlling areas) are using different costing variants. How can I define costing keys in COPA config to capture 4 separate costing variants that are executed in different controlling areas. Is there anything specific I need to set in KE4J (assignment of costing keys to material types)?. I saw there is possibility to enter up to 3 costing keys there but I don't know which purpose it serves there.
Thank you,
Karol