Jan 17, 2011 at 09:10 AM

MRP Indicator

3315 Views

Hi All,

This is regarding the MRP indicator for excluding the SLOC from MRP run.

We have the configuration settings in OMIR for the SLOC to be excluded from MRP run. If we maintain the MRP indicator as "1" for the SLOC in the configuration, it will exclude the SLOC from MRP run.

Also we have one more setting for MRP indicator in the Material Master. When we here maintain the MRP indicator in the SLOC, it will exclude the SLOC from MRP run for the material.

But which setting has the high priority? whether setting in configuration or setting in Material master?

Also we maintain the indicator in the configuration, the available stock in the MD04 includes the all the SLOC stock which has the indicator also. But we maintain the indicator in the material master, the stock is showing separately for SLOC which is excluded.

Kindly explain.

Regards,

Sureshbabu G.