Skip to Content
0
Jan 17, 2011 at 09:06 AM

Time type, time wage type selection

52 Views

I have written a PCR which calculates number of night shifts in Positive time evaluation schema ZM00 based upon the set conditions. This rule is called by ACTIO and hence the rule does not have any processing class linked to it and the result of this rule is saved in Time time type.

I want the system in time evaluation to generate time wage types based on this time type so that it can be evaluated in payroll. I have checked table TIME WAGE TYPE SELECTION RULE but taht rule generates time types based on Processing types and various other conditions. I want to know how do I assign the time type to time wage type so that I can valuate it later on.

Is there any way that we can assign any time type to time wage type so that we can get the number in that wage type........