Hello,
We are having following case / scenario:
PO has been created with the rate Rs. 10/Pc of material
Over the period of time rate of the material changed to Rs. 11/Pc of material
And again changed to Rs. 12/Pc of material
We have not amended these rates in PO.
And Goods Receipt has been already posted for these materials during this period.
We want to give this effect of change in material rates to Goods Receipt posted in that period.
How this can be done?
Regards,