Hi All, a simply question.
If i need to do an homogenious copy from a production server(ECC 6.0 with Netweaver 7) using database independant method.
This copy is for have another system for test before apply the enhancement package for the ERP.(this system never will be productive)
Then my question is, doing this copy need the server going to downtime?, or can I do the export with sapinst without stop the production sap server?
In my scenary i only need the new system for test, do i really need do the follow-up Activities specified in the system copy guide? there are a lot of activities.
I guest that this is the best method, although i can go for oracle and windows dependant method.
I already read the guides, but i need a expertice advice.
Thanks