Hello Professionals,
Here is a process flow of GR.
1. Goods Receipt : Door --> Staging area -> Storage Type 901 GR Zone -> Storage type 001 consisting of storage section.
May I know why is the Storage type in the storage section different than that in the GR zone ?
Must it always be like that as in from 1 storage type re-assigned to a different storage type?
Or is it that it should be same storage type only?
regards
Pascal