Dear SAP Gurus,
Using the 05-inspection type in material master for by product material, all the material goes to inspection lot.
how to control the inpection lot movement, i have set a plan that the inspection will be carried through a workcenter,but it moves all the materials to inspection lot.
Since all the materials are moving to inspection lot, i have changed my inpsection type to 02 (goods issue), but the problem is, i couldn't able to record the results for the created inspection lot.
Kindly guide me and correct my process flow,
Thanks in advance
Thanks and Regards,
R.Diwakar