Multi level BoM cost estimate

449 Views

Hi All,

We have lot of finished material BoMs with multiple lower level sub-assemblies.when i execute cost estimate for finished material using CK11N,system is not giving any warning or errors for lower level sub-assemblies where cost estimate is missing.

Is there any way system gives me a warning if there is a missing cost estimate for a lower level sub-assembly before I release the finished or highest level material cost estimate?

any help is appreciated.

Thanks,

Anusha