Skip to Content
author's profile photo Former Member
Former Member

ChaRM - single transport to production system

Hi Guys,

when maintenance cycle/ implementation is pushed to test/golive phase, all normal correction transports are imported into test/production system. We would like to have some transports to be imported before the other or more simply the possibility to make (for normal correction) a single transport. We know that it isn't possible with the standard ChaRM setup and so it is necessary a custom action to decouple the release of the original TR from the status u2018consolidatedu2019 for NCu2019s. The action u2018release of the original TRu2019 is assigned to a new status such as u2018gatekeeper approvedu2019. With this we would have a key to decide which TRu2019s can go first and which cannot. This is entire CRM customization. Have you a step by step guide for this customization?

Thanks

Bob

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on May 07, 2011 at 11:48 AM

    Hello eveybody,

    any update on this?

    Cheers

    Bob

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.