Skip to Content
author's profile photo Former Member
Former Member

BW 3.5 and SEM

Hi all,

We are planning to upgrade BW 2.1C/SEM 3.0A to BW 3.5 platform. It will be of great help if somebody can share their experience in:

a. Upgrade to BW 3.5 from BW 2.1C

b. Upgrade on SEM-BPS in 3.0A to BW-BPS

c. Requirements of SEM (which release, etc.)for CPM & BSC in BW 3.5.

Thanks for the help.

Sujoy

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jun 15, 2004 at 02:05 PM

    Hello Sujoy,

    To be able to upgrade to BW 3.5, you will have to wait for SEM 4.0 to be available. Lower versions of SEM are not supported on BW 3.5.

    Apart from that there should be no difference in the upgrade/functions. Check out the release notes.

    Regards

    Aneesh

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jun 15, 2004 at 05:14 PM

    Hi,

    From the BW perspective:

    I would suggest you attend the BW 3.0 delta trainings so you have a good understanding of the architectural and functionality changes with BW 3.x.

    SEM also has Delta training, if I remember correctly.

    SEM 4.0 (part of mySAP ERP) is the required SEM release for SAP BW 3.5

    I hope this helps,

    Mike.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jun 17, 2004 at 04:50 AM

    Hello Sujoy,

    Mike pointed out the dependency already, but I want to be very clear. You have an SEM system, therefore you can only upgrade to BW 3.5 if you also upgrade to SEM 4.0 at the same time!

    You can find a list with the release dependancies on the SAP Service Marketplace: http://service.sap.com/sem > Development News & Release Notes > SEM & BA Release Schedule.

    So your question (b) is not really relevant. You will have BW-BPS 3.5 and SEM-BPS 4.0, which includes the parts of BPS that are not in BW-BPS (for example, the planning applications or the cost center planning wizard).

    Regards,

    Marc

    SAP NetWeaver RIG, US BI

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.