project report and frozen report data - CJEB

0 Kudos

I would like to build frozen report data based on different selection variants as our data volume is too important that we can do it once. Now I get the problem that the last job will delete the saved date. Actually, we have created for each selection variant one report, using the same form but ideally we would like to use only one report with dedicated selection variants and extracts. Is there a possibility to save several results at the same time?

thanks a lot

Harald

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

several results in same time will not be possible.