Quantity Tolerance for material in the PO and GR

76 Views

Hi Gurus,

I have this requirement, specific material type( i.e ERSA) quantity in the PO is 100 then if I GR it, I want to have converted the 100 quantity to 150. How can this be happen? Changing the tolerance in the info record or material master?i have tried it but still doesnu2019t work?How can I do that? Converting the PO quantity to a specific quantity without changing the original figures in the PO. Please help.