Hi
Is the Safety stock maintained in the material master considered as Demand in the Long term planning using planning scenarios
What is the difference between the Initial stock field values -- if its maintained blank or maintained as 1= safety stock = initial stock . In this case is the safety stock in material master considered as demand
Thanks in advance
regards
Vikram