Hello Experts!
When I do a movement type 301 through Tx. mb1b from IM storage location to another with one item it´s all good, it creates TO's. However when I do the same with two items of the same material but different batches then it doesn't create the TO immediately, instead right after I save the movement in Tx code mb1b it takes me to Tx code LT06 to create the TO.
I have checked OMLR tx and automatic TO creation.
What I understand from the sap note 44160 and other sap documentation is that when having two or more items it is neccessary that postings are done to the same warehouse, meaning that both storage locations would be managed by the same warehouse number. But I am not sure if my understanding is right.
If I am right, is there any possible way to have the system create the TO immediately?
Thanks,
Alejandro.