Hi Exports,
I have Inspection Lot Created by 04-production goods receive, but not shown in QE72, and cannot input result or UD
Inspection Lot status: CRTD CHCR SPRQ,
in Business Process of inspection lot showing:
*Cancel inspection lot
Assign RMA proc. to insp. lot
Assign notification to lot RMA
Batch log indicator required
Certificate missing
Change inspection lot
Change planned lot quantity
Choose task list for insp. lot
Confirm Receipt of Certificate
Create part. lot for insp. lot
Flag cancellation
Inventory posting required
Lock
Lot for process documentation
Lot reset allowed
What is going wrong?
BTW, the sampling procedure in Inspection Plan is a read-only field, but empty inside.
Daniel
Dear in your case there is no Inspection plan was attached to the lot so attach the plan and make lot status to REL then only you can do Results Recording.
Inspection plan gets auto assigned to availble inspection plan on respective date if you enabled the inspction with tasklist and automatic assignment boxes in relevant inspection types in MM QM view for this Inspction plant should be made avaialble in stsyem before any lot created which can be created QP01.
If it is not getting assiged automatically then you can assign it manually by QA02 here go to inspection specification tab click on Task list assignment the go to sample tab and click on sample and SAVE Inspection plan will be attached to inspection plan.
Once inspection plan is the lot status you can see REL before assignment of a plant it would be CRTD.
Cheers
KK
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
110 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.