Change checking horizon in runtime during ATP check

Hi,

Trying to add some days to checking horizon in runtime during availability check. Any BADI or user exit, please?

Thanks,

Bijit

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Jan 20, 2011 at 10:20 PM

    Hello Singha,

    Yes. This can be achieved with little development in the core ATP check function module using any of the implicit enhancements.

    The function module that you need to look is /SAPAPO/DM_ATP2_CHECK. In the above FM; there is a subroutine called "atp_check" within which there is another subroutine "set_check_parameters" where the checking horizon calculation is being happened.

    Please debug and you can easily put an implicit enhancement to change the value at the end of the method

    CALL METHOD /sapapo/cl_locationproduct_atp=>pegid_get_end_chk_hor

    EXPORTING

    iv_pegid = is_chkreq-pegid

    IMPORTING

    ev_hortms = es_chkpar-end_of_rlt

    EXCEPTIONS

    internal_error = 1

    OTHERS = 2.

    Let me know if you need any help

    Thanks,

    Babu Kilari

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jan 03, 2011 at 12:09 PM

    Dear Bijit,

    checking horizon can be changed in material master in APO. Afterwards it should be considered while next atp check.

    Regards,

    Tibor

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi Bijit

      If you use Checking Horizon from Product Master, it would be a static entry. To make it dynamic i.e. change it during every ATP Check, you may prefer to use one of the CIF user exits. This would require development as standard SAP does not support this requirement.

      Thanks,

      Prasun

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.