UD @ Inspection Lot clearence

we are taking the Usade Decision for the In-warding Materials through QA32.

While clearing the lot there are Option to move the stock to different storage locations as follows,

OK Qty - to the specified location

Blocked Qty - to Blocked Location of the specified storage location(350 mov.typ.)

Rejected/Scrap Qty - To scrap Location (555 mov.typ.)

but there is scenario were some of the qty are need to send for Re-work process, if we moved to blocked location again need to take to un.res. use location to raise 541 mov, typ (Sent to Vendor) and also not able to get the summary and aging report for the same.

want to move these Re-work Qty to Re-work location from Inspection Lot. How to do it. whats the right option for it.

Plz propose any other option to do it.

Regards,

Kv

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Dec 17, 2010 at 05:51 AM

    Dear Create a Rework storage location and send the required qunatity to rework location while performing stock posting through usage decision.

    Cheers

    KK

    Add a comment
    10|10000 characters needed characters exceeded

    • Dear check as per Mr.M.Alagesan reply SPRO --> QM --> Quality inspection --> Inspection lot completion --> Define Inventory postings here you can difine the rework location and try check in sandbox and revert.

      Check these inputs also from SAP help with your technical guy for any issues.

      In this case, SAP cannot guarantee that all of the possible variants for quantity postings will function perfectly without program modification. If necessary, you may have to use the function enhancement (customer exit) QEVA0001 to achieve your aims.

      Use the keys VMENGE08 for additional quantity postings. Key VMENGE09 is reserved for SAP.

      These quantity postings appear on the screen when you make the usage decision.

      You can define the descriptions of these postings individually in project management for the function enhancements (transaction CMOD). Use the function "Global enhancements/Change keywords" to modify the data elements, e.g. QVMENGE08. Unfortunately, these adjustments are not visible in the Implementation Guide. They only have effect in the transaction for the usage decision.

      Check and Revert.

      Cheers

      KK

  • author's profile photo Former Member
    Former Member
    Posted on Dec 17, 2010 at 07:12 AM

    as u said that it is inward inspection and u send material to vendor again, then why u don't use Return delivey option

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.