cancel
Showing results for 
Search instead for 
Did you mean: 

UD @ Inspection Lot clearence

Former Member
0 Kudos

we are taking the Usade Decision for the In-warding Materials through QA32.

While clearing the lot there are Option to move the stock to different storage locations as follows,

OK Qty - to the specified location

Blocked Qty - to Blocked Location of the specified storage location(350 mov.typ.)

Rejected/Scrap Qty - To scrap Location (555 mov.typ.)

but there is scenario were some of the qty are need to send for Re-work process, if we moved to blocked location again need to take to un.res. use location to raise 541 mov, typ (Sent to Vendor) and also not able to get the summary and aging report for the same.

want to move these Re-work Qty to Re-work location from Inspection Lot. How to do it. whats the right option for it.

Plz propose any other option to do it.

Regards,

Kv

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

as u said that it is inward inspection and u send material to vendor again, then why u don't use Return delivey option

kiran_kumar179
Active Contributor
0 Kudos

Dear Create a Rework storage location and send the required qunatity to rework location while performing stock posting through usage decision.

Cheers

KK

Former Member
0 Kudos

Hello KK

Thanks for your reply.

what you said can be done. but i want to post a lot with following decisions under a single lot.

1. OK qty

2. Scrap Qty

3. Rework Qty

1. Ok Qty cam be posted through --> To unrestricted use field

2. Scrap Qty can be posted through --> To scrap

3. Through which field can post the Reowrk Qty

there are other fileds too, any of it will help us with mentioned subject.

kindly help me.

Regards

Kv

kiran_kumar179
Active Contributor
0 Kudos
Through which field can post the Reowrk Qty

Dear Create a Rework location first during first stock posting through UD post the required stock to unrestricted and scrap then for same lot you can go to QA12 in stock posting tab you can see stock to be posted qunatity post that stock to unrestrcited but select the location rework and complete the stock posting.

Cheers

KK

Former Member
0 Kudos

Thanks Again KK

tried postingas you said.

1. not able to access the lot without releasing the lot to Green flag.

2. thus tried to post the lot with green flog but its forcing to post the whole lot, thus not able to access the balance qty to post through QA12.

is there any option to close the lot partially and access using QA12.

former_member494495
Active Contributor
0 Kudos

Hi,

SPRO --> QM --> Quality inspection --> Inspection lot completion --> Define Inventory postings

New Entries.

You can define for posting into Rework SLoc.

kiran_kumar179
Active Contributor
0 Kudos

Dear check as per Mr.M.Alagesan reply SPRO --> QM --> Quality inspection --> Inspection lot completion --> Define Inventory postings here you can difine the rework location and try check in sandbox and revert.

Check these inputs also from SAP help with your technical guy for any issues.

In this case, SAP cannot guarantee that all of the possible variants for quantity postings will function perfectly without program modification. If necessary, you may have to use the function enhancement (customer exit) QEVA0001 to achieve your aims.

Use the keys VMENGE08 for additional quantity postings. Key VMENGE09 is reserved for SAP.

These quantity postings appear on the screen when you make the usage decision.

You can define the descriptions of these postings individually in project management for the function enhancements (transaction CMOD). Use the function "Global enhancements/Change keywords" to modify the data elements, e.g. QVMENGE08. Unfortunately, these adjustments are not visible in the Implementation Guide. They only have effect in the transaction for the usage decision.

Check and Revert.

Cheers

KK