Hi,
I have a nwdi track with the ability to create VC and webdypro DCs. I created a Visual Composer DC and created a model within it. This activity was activated and released and I could preview the vc model successfully.
I checked-out the model assigning it a new activity, and made changes to this vc model. Saved the model. So far so good.
The problem occurs when I try to check-in this particular activity. And the same problem occurs when I try to create a second or third VC model within the DC and try to check them in.
Infractructure console in nwds says:
FAILED: CHECKIN on activity act_w_ABCCOMP_abc_2e_com_
ABCCOMP_dev_inactive_u_nss09_t_2010_12_07_17_28_15_GMT_276e3e68-4ac5-4177-acd1-4efe79a327f7 failed : The operation was aborted because: Could not Check in Activity. See ErrorLog for more Details..:operation failed at10:43:52.528
The Error Log View in nwds says:
com.sap.ide.devserver.eclipse.diievent.DIIEventListener:Could not check in activity Reason: Model(s) {home/abc_cust_impl=nwdi_test} not Compiled. Solution : Open the Model(s) in VisualComposer and Compile it.
Regards,
Namrata Shenoy