Time Constraint Type T for IT0380

Currently we have the Time Constraint on IT0380 set to 3, but that results in Infotypes getting created as shown below with the second Infotype with the same BEGDA but a different subtype and different ENDDA getting SEQNR = 1. Because of this if someone were to run the program that inserts these records again, I assume it would create a new record with SEQNR = 2. I only want 1 record for a given SUBTYPE to active in a period so I was looking at changing the Time Constraint to T. The ENDDA will not be 12/31/9999 on these records. Is this a good idea and will it accomplish what I'm trying to do?

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Dec 15, 2010 at 11:21 PM

    Hello Sir,

    Of course you can, but this configuration needs to be consistent. How so?

    On V_T582A, you configure the Infotype for Type T as you mentioned.

    Then, on V_T591A you configure how you want the constraints on the subtypes for this particular IT 0380.

    This is possible indeed.

    Regards,

    Bentow

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.