Cost center : 809

Presently it is valid till 12/31/2016 and needs to extended till 12/31/9999.

Please let me know how to change the Date to 12.31.9999. I am getting an error message "New analysis period must not exceed maximum period.

I have created a same cost center with validity from 01.01.2017 to 31/12/9999, then automatically it extends the cost center but i am getting error "

Control location -----is not intended for country US"

Message no. KS151.

Please help with the solution.