Hi All
We have set up a new warehouse that we want to use Material Staging.
The Production area is also set up. I have the following master data set up:
Production Supply Area - ABC1
Work Centre - ABC1
Control Cycle (with staging indicator as 4 - Manual Staging)
Destination Storage bin - ABC1
I have released a test production order with 4 materials (all have the backflush ind)
But I cannot see anything in LB10. I am expecting to see a TR where I can convert to a TO (remove materials from warehouse and send to the PSA) and then confirm. This should put material in the PSA and backflushed when production order is completed.
Is there some config that I am missing?
Thanks in advance
DArren