on 12-13-2010 4:52 AM
Hello
I am having a very peculiar situation. We had made all settings for activity price calculation and already run the cost estimates, etc. Since last day, it is noticed that the activity prices are not getting calculated in the costing run. All settings are in place, still we are wondering why this is happening ? System giving messages like structure not defined or formula is not in the work centre, etc. But these are there we checked.
Hi Niki
I would suggest to check your work centre formula once again...
Such type of messages are never thrown un-justifiied by the system
Regards
Ajay M
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Ajay
Correct formula is given.
I am pasting the error message here:
Missing formula in work center PPKGALFL
Message no. CK430
Diagnosis
In routing or network 50000147, you have entered the standard value 003 for operation 3010. Operation 3010 is performed at work center PPKGALFL.
Based on the formula in the work center and the standard value in the operation, the system computes how much activity is expected for the activity type. This activity is valuated on the basis of the activity prices in cost center accounting to calculate the planned costs for the operation.
In the case at hand you have not entered a formula in work center PPKGALFL or you have deleted the formula in work center PPKGALFL.
Hi
Shall I suggest some thing?
Delete your routing operation and maintain it again... Usually, the formula in work center is controlled by the Formula Parameters specified in the formula.. You can also test the work center formula in the work center by clicking on the "Calculator" like icon
Regards
Ajay M
Hi Niki
Thats what I was saying.. There is some thing wrong in your formula
If say, your act type is meant for POWER.. In PP, you would create one formula value key ZSAP_01 for POWER...
Now your formula should read as ZSAP_01 * Op Qty / Base Qty... (The Op & Base Qty also have a parameter key in the std system.. Take the help of your PP consultant
Regards
Ajay M
Hi Niki,
Then the problem is in Formula for costing In workcenter
1) Check the formula for calculation is correct?
2) check in OP54 allowed for calculation tick is there for the formula in Costing
3) maintain a Price for activity in Kp26
3) and then check formula test in Work center using Calculation
When we click the 'calculator' icon, values are coming as zero.
then the problem is in Work center only
check the following things in Work center
1) Check the standard value key in work center & the formula assigned to it for that activity and compare with the work center formula in OP54
ex:
check the Op19 for that std value key
suppose for machine the value is assigned as SAP_02
if the machine hrs is assigned in activity and formula is SAP006
then go to OP54 and check the formula for SAP 006 SAP_02 * SAP_09 / SAP_08 and check allowed for calculation is ticked
and then go to op51 note down the SAP_02- machine time, SAP_09- Operation quantity/ SAP_08- Base quantity
costing only works , both the std value key and formula have same parameter SAP_02
Otherwise it won't work
>
> Yes. Now when I ran the standard costing run, other type of errors are noted:
>
> - Cost component split costed with value of zero
> -No price could be determined for material/batch 15010010002/ plant 2200
>
>
> The above are error messages.
Material 15010010002 in plant 2200 doesn't have any Price, Check in Material master costing view, maintain it accordingly or in MR21
thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi nikitha..
pl check operation overview whether activity is defined or not.
kkumar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi..
is it for plan price or act price.
if for act price, pl check activity type master data and see whether you have selected "Actual price indicator"-- 5 or not
kkumar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hello guys, since this post was Answered i would like to know how was the problem fixed because im having the same message CK430 that said that the formula in my work center wasnt there but when i go to my work center and i test my formula its working fine but in the maintenence order it said that there was a problem during cost estimate in KP26 i allready placed a price for my activity for the month im working on, thank you in advance for your help, kind regards.
Hi,
Similar problmes reported in our processes. Problem located at the belowing:
-Check if the Operation captured Activities under the Tab Quantities/Activities. It could be due to Standard Routing for operation does not contain the Activities under the section "Standard Values.
-Can also check assignements of Workcenter/Activity Types, Costing relevancy of the operation.
Umapathi G
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
110 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.