calculated field in model of easy cost planning

Hi,

I would like to introduce the cost model easy planing a calculated field (characteristic), which was the multiplication of two fields (Characteristics).

I have entered into the transaction CKCM "Easy Cost Planning: Model", I created 3 Characteristics (A,B,C)through the option

"Assign Characteristics to the model."

I entered the "Define the derivation rules (template)" and created a calculation with the two characteristics( C = A * B). The problem I have is that I did not enter the calculation in characteristic 3, which is what I want to pick up the value.

Many Thanks.

Regards.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • avatar image
    Former Member
    Dec 04, 2010 at 01:04 AM

    Hi,

    Can you let us know how you have defined this calculation row and also what is maintained in the activation. Better still if you can upload a screenshot to some portal n paste the link here will help for a better understanding.

    Regards,

    Vivek

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Vivek,

      Thanks for answering.

      My question is, how I can assign a calculation in a characteristic?

      Characteristic A

      Characteristic B

      Characteristic C = A * B

      I want the easy cost planning screen, enter a value in the characteristic A and B, it will automatically calculate the C and view the calculation in the screen in characteristic C. As I can do?