cancel
Showing results for 
Search instead for 
Did you mean: 

Process Chain Failed for Perticular day, want to take load from R/3 for day

0 Kudos

Hi Experts,

While monitoring the process chain i found that on 16 Nov2010 the schedule got failed then i checked but that was due to rfc connection to R/3 failed then again i repeated the process in RSPCM. But toady in the morning when i was checking i found that for 17 nov scheduled got run successful but when i drilled down on date for 16th data but it was failed for 16. Now please guid me how to bring the data for 16nov from R/3. My process chain contains both Master Data/ Transaction Data and Deltas / Full loads ???

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Vikranth,

When ever Load(info package) got failed, Change the QM status to RED and then repeat the load, this will bring the data for last delta(you can goto Info package Monitor> Header tab>you can notice the Processing tab :is set to be Repeat Delta).

If you do not change the QM status to RED and then repeat the Delta , then you will miss the last failed delta. If you miss any delta then go for selctive loading, Exceute the Infopackage as a Repair Full Request with selection for 16-11-2010.

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

As you have mentioned in your post, the process chain for 17th has finished successfully, can you confirm if all the dataload also finished successfully?

If the dataload also has finished successfully, then ther is not much to be done from your side. Pplease note below points

1. For Delta Loads- No need to worry about them. For standard datasources, the system would have automatically fetched all the deltas since your last successful delta load. For generic datasources as well, based on previous delta pointer in RSA7, all the delta records would have got fetched.

2. For full dataloads- Check the selection criteria in your infopackages. If its based on date, then you would have to do dataload again.

The selection criteria for this dataloads should include the dates for 16th & 17th dataload. Everything else should be fine.

Else, if your dataload did not finish succesfully on17th, though the process chain has finished. You need to do below

1. For all the delta loads- Carry out Repeat Delta loads. This would fetch all the deltas missed. After this load, all the deltas would continue to come normally.

2. For full loads, perform same as mentioned in point 2 above.

Former Member
0 Kudos

Hi,

Check for that info pck if its a full load with any selecion condition if this selection condition is static then no need to do anything it will birng the full data on the 2nd run of its a dynamic selction then you need to change the selecion to the selction which is used for 16th Nov and load it.

If this is a delta load then check the next sucessfull laod if it is a repeat delta if it is no issues.Other wise you can do a repair full request for 16th by using some sleciton conditions.

Ravi