Skip to Content
0
Former Member
Nov 16, 2010 at 06:29 PM

Event Schedule Timing

33 Views

We are needing to setup an event based upon an updating to a database table.

1) Is this possible for a event trigger to watch a database table?

2) I believe the timing for an event is it checks every minute to see if the criteria is set, can we set that timing at a lower level instead of every minute can we set it to every second?

Thanks,

Jay