Cost center 1202 not pulling into LTP.

Former Member
0 Kudos

Hi All,

I have a major issue in LTP. There are few materials which are notr flowing into LTP- KSPP. When we did tha analysis we found that the Cost center 1202 assigned in the work center of routing of not material had some issue. Only those materials whose work centers has the cost centers as 1201 are flowing into LTP. rest are not flowing at all..

PLease tell all the necessary confi and settings required for any work centers to pull the Materials in kspp.

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Done by Self.

Issue in planning scenario

sundaresan_velayudam
Active Contributor
0 Kudos

1) check the relevant work center in the capacity tab--> header, Is the Long term planning is ticked or not?

2)Check in costing tab for the work center, what is the validity start date- on that day what is the basic start date of LTP plan is valid?

3) Is routing is valid start date - on that day what is the basic start date of LTP plan is valid?